Cantiere | Interior concrete surface preparation, leveling, installation of ceramic tile, wood flooring with sound-reduction and exterior large-format tiles |
---|---|
Località | Burlington, Canada |
Sottocategoria | HOTEL |
Costruito nel | 2021 |
Intervento | A variety of setting materials and innovative sound-reduction products from MAPEI were all part of completing a new-build complex of luxury residences and a four-star Marriott hotel on Lake Ontario’s north shore. |
Inizio e fine dei lavori | 2016/2021 |
Tipo di intervento | Nuove costruzioni, Tile & stone installation systems |
Committente | The Rosseau Group Inc. and Pearle Hospitality (The Pearle) |
Impresa appaltatrice | New Horizon Development Group |
Imprese esecutrici | Classic Tile Contractors Limited (Bridgewater) and Eden Tile-It (The Pearle) |
Distributore MAPEI | Dragona Flooring et Prosol Inc. |
Credits | Carole & Roy Timm Photography and Greg van Riel Photography |
Coordinatore MAPEI | Gino D'Alesio |
Altro | Architects: Gluckstein Design Planning (Bridgewater) and Studio Munge (The Pearle) |
Qui puoi scaricare tutti i documenti relativi al progetto