Chantier | tennis courts and netball courts |
---|---|
Localisation | Ascot Vale (Melbourne), AUSTRALIE |
Type de projet | CLUB DE GOLF, TERRAIN DE TENNIS |
Intervention |
Installation of Mapecoat System on tennis courts and netball courts
Surface Preparation sequence; • Clean and prep new concrete bases post 28 days curing using a combination of mechanical (diamond) grinding and high-pressure water blasting. Surfacing System sequence; • Apply ‘Mapecoat I 600 W Primer’ to courts. • Minor patching & levelling of new concrete surface as required using Mapecoat TNS White Base Coat • Apply ‘Mapecoat TNS Finish 1 – Velocity Blue’ to the centre of courts. (First ‘finish’ coat) • Apply ‘Mapecoat TNS Finish 1 – Velocity Blue’ to the centre of courts. (Second ‘finish’ Coat) • Apply ‘Mapecoat TNS Finish 1 – True Blue’ to the perimeter of courts. (First ‘finish’ Coat) • Apply ‘Mapecoat TNS Finish 1 – True Blue’ to the perimeter of courts. (Second ‘finish’ Coat) • Apply ‘Mapecoat TNS White Lines’ for tennis to courts. • Apply ‘Mapecoat TNS Yellow Lines’ for netball to courts. |
Début et fin des travaux | 2019 |
Type d'intervention | Solutions for sports flooring, Préparation des supports |
Titulaire Client | Tennis and Netball Centre |
Maître d'ouvrage/entreprise générale | Turf One Pty Ltd |
Entreprise de construction/pose | King of Courts Pty Ltd |
Maître d'œuvre | Moonee Valley City Council |
Conseiller technique MAPEI | Nicolas Cheal |