Chantier | Mapei specified for new state of the art Birmingham maternity suite |
---|---|
Localisation | ROYAUME-UNI |
Type de projet | HÔPITAL |
Intervention |
Mapei specified for new state of the art Birmingham maternity suite
Works to a brand new, state of the art maternity suite at a hospital in Sutton Coldfield, Birmingham has now been completed, with Mapei products used exclusively for the installation of vinyl and safety flooring. Following a site visit to the Fothergill Building, the existing substrate to the main area of the fourth floor was identified as a concrete slab overlaid with an old levelling compound, and vinyl flooring adhesive residues. As the concrete substrate was generally solid and sound, work began to mechanically remove the existing smoothing compound and adhesive residues. Once cleaned and vacuumed, the prepared substrate was primed with Mapei’s solvent-free, acrylic based Eco Prim T Plus, diluted with one part to two parts of clean water. Mapei’s two-part cement based smoothing and levelling compound, Latexplan No Ammonia was then applied to infill areas. These areas were also primed with Mapei Eco Prim T Plus; this adhesion promoter encourages inter-coat bonding and its low odour made it the ideal choice of primer. To ensure lower sections of the substrate met existing floor levels, Mapei Latexplan No Ammonia was applied, followed by a third application of Mapei Eco Prim T Plus to the entire floor. A third and final application of Mapei Latexplan No Ammonia was then applied to ensure the subfloor was completely level, and to provide a single, constant floor to receive the vinyl floor coverings – something that was essential, given the hospital setting. Once the substrate was prepared, Sheldon Flooring – working for Main Contractor E Manton LTD –installed Polyflor Expona Flow for a contemporary finish. The vinyl sheets were bonded with Mapei Ultrabond Eco VS90 Plus, a high temperature universal acrylic-based adhesive with very low VOC that is ideal for use with most resilient floor coverings. The substrate within the en-suites, was terrazzo tiles that were solidly bonded and laid to a slight fall which accommodated drainage. The substrate was mechanically abraded, and once prepared, it was primed with Mapei Eco Prim T Plus. Mapei Latexplan No Ammonia was then applied to ensure a complete smooth surface. High performance, one-component polymer-silylate adhesive Mapei Ultrabond Eco MS 4 LVT was used to install heavy duty wet room safety flooring Polysafe Quattro, specifically designed to provide a high degree of slip resistance in continually wet areas. The utility rooms were installed with Polysafe Vogue Ultra vinyl flooring which was fixed with Mapei Ultrabond Eco VS90 Plus, a Mapei adhesive suitable for resilient floorcoverings, and ideal for areas subjected to static and dynamic loads. Following the completed work, Contracts Manager at Sheldon Flooring, Dirk Baker said, “From start to finish Mapei provided an excellent service, backed up by products you can trust.” |
Type d'intervention | Sols |
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.