Chantier | Interior and exterior, pools |
---|---|
Localisation | FRANCE |
Type de projet | Parc aquatique |
Construit en | 2020 |
Ouvert en | 2021 |
Intervention |
Supply of the products necessary for the preparation of the supports, waterproofing, gluing of the gluing the tiles and making the joints
Areas created by CMB with MAPEI solutions : 1 sports pool with movable floor (525 m²) 1 learning-recovery pool (168 m²) Sports hall with bleachers and entrance hall 1 leisure pool (200 m²) 1 animated paddling pool (40 m²) 1 balneotherapy and relaxation pool (50 m²) 3 thematic baths 1 hammam and 1 sauna Showers and massage showers Changing rooms and sanitary facilities Pool decking Various rooms: 2 massage rooms, herbal tea room, back office premises 6,900 m² of tiling laid |
Début et fin des travaux | 2020/2021 |
Type d'intervention | Préparation des supports, Tile & stone installation systems, Imperméabilisation |
Titulaire Client | La Cali (Communauté d'Agglomération du Libournais) |
Entreprise de construction/pose | CMB |
Architecte/planificateur | AP-MA Architectures, ACTION ARCHI |
Responsable de projet | DEKRA INDUSTRIAL, SEBAT, SOJA INGENIERIE |
Photos | Quentin Belloncle, Géraldine Bruneel |
Conseiller technique MAPEI | Laurie Saintenac |
Vous pouvez télécharger ici tous les documents associés à ce projet
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.