Chantier | All interior floors, living room, bed room, kitchen |
---|---|
Localisation | Bandung, INDONÉSIE |
Type de projet | MAISON |
Construit en | 2024 |
Ouvert en | 2024 |
Intervention | Application of ULTRATOP LOFT on the house interior |
Type d'intervention | Sols |
Entreprise de construction/pose | CV Daya Mitra Inti |
Architecte/planificateur | Architect: Blocstudio , Interior: ink design studio |