Bereich | Interior floor protection for a dog daycare and boarding facility in Auckland looking after over 500 dogs at various times. 800m2 floor split into 5 different areas for different activities |
---|---|
Standort | Neuseeland |
Projektart | DOGENPALAST |
Durchgeführte Arbeiten |
Installation of Mapeoor Sytem 31 HD with Mapeoor Finish 57
The concrete floor was ground using an industrial grinder and a coat of Primer SN epoxy primer was installed. This was followed by a coat of the Mapefloor I 302 SL high build solvent-free epoxy and a top coat of the Mapefloor Finish 57 was installed as a final abrasion-resistant floor coating. The applicator recommended the Mapefloor Finish 57 to their customer due to their previous success with the product being used in a very aggressive environment. |
Baubeginn und -ende | 2019 |
Art der Anwendung | Industrieböden |
Auftragnehmer/Generalunternehmen | Epoxy Flooring |
Ausführer/Verarbeiter | Epoxy Flooring |
Technischer Verkaufsberater MAPEI | Scott Lacey |
Sie wollen wissen, was es Neues gibt bei Mapei?
Melden Sie sich einfach für unseren Newsletter oder unser Magazin Realtà Mapei an.
Copyright © 2024 MAPEI SUISSE SA. Alle Rechte vorbehalten
MAPEI SUISSE SA, Route Principale 127, 1642 Sorens (Schweiz)