Bereich | overflow pools in a hotel in Corsica |
---|---|
Standort | Calcatoggio, Frankreich |
Projektart | SCHWIMMBAD |
Durchgeführte Arbeiten |
Waterproofing and bonding the stone sheet Flexi Pierre® in swimming pools in a hotel in Corsica
The new reinforced concrete pool was first waterproofed with MAPELASTIC, a two-component elastic mortar for protecting and waterproofing of concrete. Easy to apply, it forms a flexible, waterproof coating with excellent resistance to sulfates, chlorides and CO2. The coating was applied 3 weeks after the waterproofing layer had completely dried. Once the layout had been laser-drawn, the 122 x 61 cm stone sheets were glued edge-to-edge, one after the other, using KERAPOXY EASY DESIGN. This anti-acid, anti-mould epoxy mortar (BioBlock® technology) is quick and easy to apply and clean. |
Baubeginn und -ende | 2022 |
Art der Anwendung | Abdichtungen |
Kunde | Hôtel Castel d’Orsino |
Ausführer/Verarbeiter | Sylvestre Foïs Carreleur |
Fotos | Deco Pierre 81 - Les Ardoisiers - Flexi Pierre® - Hôtel Castel d'Orsino |
Bauherr | Deco Pierre 81 - Les Ardoisiers - Flexi Pierre® |
Technischer Verkaufsberater MAPEI | Laurent Reymond |
Hier können Sie alle Dokumente zu diesem Projekt herunterladen