The Cocoa Works

Location icon York, Royaume-Uni
N° réf. : 20122024
Catégorie : RÉSIDENTIEL

Réalisation

Chantier A Mapei resilient flooring system has been used to complete an extensive project at The Cocoa Works in York.
Lieu York, Royaume-Uni
Sous-catégorie Appartements
Application Installed by Titan Flooring, the project spanned apartment living rooms, bedrooms and corridors throughout the luxury redevelopment, on the site of the former iconic Rowntree Factory.
The project was completed by Henry Boot Construction for Latimer – the development arm of Clarion Housing Group. Originally dating back to the 1890s, the Rowntree Factory is located on an eight-hectare site of historical significance. Derelict for over a decade, the building has been sensitively restored, with the new characterful-contemporary design embracing original features throughout. Designed by Weedon Architects, the building includes 279 luxury one, two and three-bed apartments surrounded by landscaped gardens and external spaces. Floor preparation works were completed throughout the historic site using two Mapei products. They included ECO Prim T Plus universal acrylic primer and Ultraplan Renovation Screed 3240 – a fibre-reinforced smoothing compound. Both the primer and screed feature very low VOC EMICODE: EC1 Plus formulations.
Type d’application Installation de planchers
Entrepreneur Henry Boot Construction
Installateurs Titan Flooring
Architectes Weedon Architects
Spécialistes impliqués Latimer – the development arm of Clarion Housing Group

Produits utilisés pour le projet

ECO PRIM T PLUS
ECO PRIM T PLUS
Produit non offert pour ce marché,
nous contacter
Ultrabond Eco Tack TX+
Ultrabond Eco Tack TX+
Produit non offert pour ce marché,
nous contacter
ULTRABOND ECO TX3
ULTRABOND ECO TX3
Produit non offert pour ce marché,
nous contacter
ULTRABOND ECO VS90 PLUS
ULTRABOND ECO VS90 PLUS
Produit non offert pour ce marché,
nous contacter

Keep in touch

Subscribe to our newsletter to get Mapei news