Chantier | pools and wet rooms |
---|---|
Lieu | Flitwick, Bedfordshire, Royaume-Uni |
Sous-catégorie | Centre sportif |
Application | installation of ceramics and wet rooms |
Date de début et de fin | 2016 |
Type d’application | Revêtements pour sols/murs |
Propriétaire | Stevenage Leisure Ltd. |
Entrepreneur | Tiletec Group |
Installateurs | Tiletec Group |
Autre | The £14.7m new build leisure centre comprises a 25m2 competition pool, 13m2 learner pool (with raised floor) and confidence water pool. In addition to the pools, there are four discrete changing/shower areas which have been fully tiled; wet change, dry change, outside change and fitness suite changing, along with floor tiling to circulation areas and staircases amounting to a further 750m2 of tiling. |