Rothorn Sörenberg

Location icon Sörenberg, Suisse
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
N° réf. : 4658
Catégorie : INFRASTRUCTURES

Réalisation

Chantier ceiling of the passage tunnel
Lieu Sörenberg, Suisse
Sous-catégorie Tunnel
Application At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Date de début et de fin 2023
Type d’application Produits pour la construction souterraine (UTT)
Installateurs Gasser Felstechnik AG, Lungern
Spécialistes impliqués Rothornbahn Sörenberg
Photographe Ramon Lehmann Fotografie
Coordonnateur MAPEI Urs Wirth

Produits utilisés pour le projet

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Produit non offert pour ce marché,
nous contacter
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Produit non offert pour ce marché,
nous contacter
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Produit non offert pour ce marché,
nous contacter

Keep in touch

Subscribe to our newsletter to get Mapei news