Yard | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Location | Hérémence, Switzerland |
Subcategory | Hotel/Inn |
Application | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Start and finish date | 2022 |
Application Type | Floor Covering Installation Systems |
Architects | Mijong Architecture Design |
Specialists involved | Grande Dixence SA |
MAPEI Coordinator | Marcello Maieron |