Parking deck (exterior): System for heavy-duty vehicular traffic

Hospitality
Car parks
Protecting concrete from vehicular traffic

Issue: Wheel traffic and low-speed turns

Solution: A highly bonded system of products protecting the substrate and resisting the force of rolling loads and turns

Application steps

1
Concrete
2
Two-component primer
Mapefloor PU Primer
3
Polyurethane basecoat
4
Polyurethane topcoat
5
Polyurethane topcoat with sand broadcast

Headphones iconDo you need help? Contact us

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news