Below-grade waterproofing (blindside)

Residential high-rises
Waterproofing
Installation of blindside waterproofing

Challenges: Prevent water intrusion into buildings that have limited access and ability to excavate during construction, and are adjacent to an existing structure or property line

Solution: Blindside waterproofing, through the Mapeproof waterproofing system, to prevent water intrusion

Application steps

1
Wood lagging
 
2
 Prefabricated drainage composites

3
Prefabricated drainage composites

4
Bentonite clay waterproofing membrane

5
Sodium bentonite granules

6
Prefabricated drainage composites (end outlet)

Headphones iconDo you need help? Contact us

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news