Pátio | Renovation and change of use of the premises of the physiotherapy practice. |
---|---|
Local | Bex, Switzerland |
Subcategoria | HOSPITAL |
Aplicação | The floor subfloors had to be levelled before installation. This was achieved by means of spot filling, vapour retarders and final smoothing. In addition, 320m² of LVT flooring was laid with Ultrabond Eco 4 LVT. |
Datas inicial e final | 2022 |
Tipo de aplicação | Pavimentos |
Arquitetos | JME architecture SA |
Gerente de projetos | Start.Physio |
Coordenação da MAPEI | Marcello Maieron |