Forchbahn of the tunnel in Zumikon

Location icon Zumikon, Switzerland
N° de ref.: 4640
Categoria: TRANSPORTES

Construção

Pátio From 2022 to 2024, both tracks will be completely replaced and new points with a larger radius will be installed. Instead of the existing track structure with ballast and wooden sleepers, a solid concrete track will be installed.
Local Zumikon, Switzerland
Subcategoria TÚNEL
Aplicação The Forchbahn tunnel between Waltikon and Neue Forch, built in the 1970s, was renovated. Damage to the building fabric as well as various modernisation works were necessary. The work was carried out during ongoing railway operations.
Datas inicial e final 2022/2024
Tipo de aplicação Pavimentação
Empresas instaladoras Diamantbohr AG
Gerente de projetos Forchbahn AG
Coordenação da MAPEI Reto Stutz

Produto usado para o projeto

ADESILEX PG2
ADESILEX PG2
Product not avalaible for this market,
contact us
CARBOPLATE S
CARBOPLATE S
Product not avalaible for this market,
contact us

Permaneça em contato

Assine o nosso informativo para receber novidades da Mapei