Rothorn Sörenberg

Location icon Sörenberg, Switzerland
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
N° de ref.: 4658
Categoria: INFRAESTRUTURAS

Construção

Pátio ceiling of the passage tunnel
Local Sörenberg, Switzerland
Subcategoria TÚNEL
Aplicação At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Datas inicial e final 2023
Tipo de aplicação Construções subterrâneas
Empresas instaladoras Gasser Felstechnik AG, Lungern
Gerente de projetos Rothornbahn Sörenberg
Créditos Ramon Lehmann Fotografie
Coordenação da MAPEI Urs Wirth

Produto usado para o projeto

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not avalaible for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not avalaible for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not avalaible for this market,
contact us

Permaneça em contato

Assine o nosso informativo para receber novidades da Mapei