Project | The new South Beach Hotel |
---|---|
Plaats | singapore |
Omgeving | HOTEL |
Ingebouwd | 2012 |
Geopend in | 2015 |
Projectomschrijving | Adhesives solutions for the South Beach hotel |
Start- en einddatum | 2012/2015 |
Toepassing | Vloeren/muren |
Aannemer | Hyundai Engineering & Construction Co. Ltd |
Uitvoerder | ASR Building & Conservation Pte Ltd, Aegis Building & Engineering Pte Ltd, SJ Marble (Singapore) Pte Ltd |
Architect | Aedas Pte Ltd |
MAPEI distributeur | Mapei Far East Pte Ltd |
Beschrijving |
Mapei adhesives were used extensively in the washrooms of all 654-guestrooms and hotel lobby. In both areas, Keraflex was used for fixing marble onto floors and Keraflex Maxi S1 was used for fixing marble onto walls. Keracolor SF was used for grouting the joints. |