Project | Sarawak Aquatic Centre, Kuching |
---|---|
Plaats | Kuching, malaysia |
Omgeving | aquarium |
Ingebouwd | 2015 |
Geopend in | 2015 |
Projectomschrijving | Sarawak Aquatic Centre, Kuching |
Toepassing | Vloeren/muren |
Opdrachtgever | Jabatan Kerja Raya Sarawak (Public Works Dept) |
Aannemer | Hock Seng Lee Bhd |
Uitvoerder | ABK Pte Ltd |
Project Manager | Perunding Dayacipta |
MAPEI distributeur | Mapei Malaysia Sdn Bhd |
Beschrijving |
The RM163-million Sarawak Aquatics Centre with diving, competition, leisure and training pools was newly built for Sukma and will also be used for the South-east Asia (SEA) Games in 2017. Built to FINA (International Swimming Federation) standards, Agrob Buchtal swimming pool ceramics from Germany were specified. ABK Pte Ltd, the reputable contractor from Singapore appointed for the installation works, was insistent on using MAPEI adhesives for the tiling works based on their previous and extensive experience. Total installed area 8,000 m2 |