Sabah Ammonia Urea Plant

Location icon Sipitang, malaysia
Ref #: 60000036
Categorie: PRODUCTIE FACILITEITEN

Projectgegevens

Project Sabah Ammonia Urea Plant
Plaats Sipitang, malaysia
Omgeving fabriek
Ingebouwd 2014
Geopend in 2015
Projectomschrijving Tank Lining & Waterproofing
Toepassing Waterproofings
Opdrachtgever Petronas Chemicals Group Berhad
Aannemer Mitsubishi Heavy Industries / Apex Energy Sdn Bhd / PT Rekayasa Industri Consortium
Uitvoerder Hycrete Mecure Sdn Bhd
Architect Architect HaoYun
MAPEI distributeur Mapei Malaysia Sdn Bhd
Beschrijving Construction of Petronas Chemicals Group Bhd’s Ammonia Urea Complex in Sipitang- Sabah started in mid-2012. The RM5 billion BEPCC contract – Basic and Detailed Engineering, Procurement, Construction and Commissioning – was undertaken by a consortium comprising Mitsubishi Heavy Industries, Apex Energy Sdn Bhd and PT Rekayasa Industri.

The SAMUR Project involves the development of a new fertiliser plant with urea production capacity of 1.2 million metric tons per annum (mmtpa). The plant will be located on 166 acres of land in the Sipitang Industrial Park, Sabah.

Also known as the SAMUR Project, the complex located in the Sipitang Oil & Gas Industrial Park comprises an ammonia plant, a urea plant, a granulation plant, integrated utility units and jetty facilities.

Completion is scheduled for February, 2016.

Besides waterproofing for the roof slab, a highly chemical-resistant and abrasion-resistant lining was required for the ammonia processing plant’s cooling tower.

Mapei Products: PRIMER SN, MAPECOAT VE825 AP, MAPETEX GRP225, PLASTIMUL MY, MAPETHENE TA 3MM

Gebruikte producten

PRIMER SN
PRIMER SN
Tweecomponenten epoxy voorstrijkmiddel met filler TECHNISCHE GEGEVENS:…
2170
2170
Product not available for this market,
contact us
561
561
Product not available for this market,
contact us
942
942
Product not available for this market,
contact us

In contact blijven

Abonneer je op onze nieuwsbrief om nieuws over Mapei te ontvangen