Project | terminal and air traffic control tower |
---|---|
Plaats | Isztambul, turkey |
Omgeving | luchthaven |
Ingebouwd | 2016 |
Geopend in | 2028 |
Projectomschrijving | supply of products for substrate preparation, waterproofing surfaces in tanks and terraces, chemical anchoring, installing and grouting ceramic tiles, sealing joints, coating walls |
Start- en einddatum | 2016/2018 |
Toepassing | Anchoring, Vloeren/muren, Waterproofings |
Opdrachtgever | IGA-Istanbul Great Airport |
Aannemer | CMLKK JV - Cengiz Mapa Limak Kolin Kalyon Joint Venture |
Uitvoerder | Umut Yalitim |
Architect | Nordic Office-Grimshaw-Haptic Architecture; Pininfarina-Aecom |
MAPEI distributeur | Umut, Himerpa, Pelenkoglu |
Project Manager | Horizontal |
Mapei coördinatie | Emrah Karatas, Mapei Yapi Kimyasallan A.S (Turkey) |