Klang Valley Mass Rapid Transit (KVMRT)

Location icon malaysia
Ref #: 60000032
Categorie: INFRASTRUCTUREN

Projectgegevens

Project Klang Valley Mass Rapid Transit (KVMRT)
Plaats malaysia
Omgeving metro
Ingebouwd 2013
Geopend in 2014
Projectomschrijving Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station
Start- en einddatum 2013/2014
Toepassing Waterproofings
Opdrachtgever Mass Rapid Transit Corporation Sdn Bhd
Aannemer MMC Gamuda KVMRT (T) Sdn Bhd
Uitvoerder CRT Specialist (M) Sdn Bhd
Architect Mott MacDonald (M) Sdn Bhd (Engineers)
MAPEI distributeur Mapei Malaysia Sdn Bhd
Beschrijving The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform. The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform. The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.)

Gebruikte producten

PRIMER SN
PRIMER SN
Tweecomponenten epoxy voorstrijkmiddel met filler TECHNISCHE GEGEVENS:…
334 - BIBLOCK
BIBLOCK
Product not available for this market,
contact us
434 - IDROSTOP SW
IDROSTOP SW
Product not available for this market,
contact us
943 - IDROSTOP TUBOFLEX
IDROSTOP TUBOFLEX
Product not available for this market,
contact us
2299 - MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Product not available for this market,
contact us
2126 - PURTOP 1000
PURTOP 1000
Product not available for this market,
contact us

In contact blijven

Abonneer je op onze nieuwsbrief om nieuws over Mapei te ontvangen