Project | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Plaats | Hérémence, switzerland |
Omgeving | HOTEL |
Projectomschrijving | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Start- en einddatum | 2022 |
Toepassing | Vloeren/muren |
Architect | Mijong Architecture Design |
Project Manager | Grande Dixence SA |
Mapei coördinatie | Marcello Maieron |