Forchbahn of the tunnel in Zumikon

Location icon Zumikon, switzerland
Ref #: 4640
Categorie: transportation

Projectgegevens

Project From 2022 to 2024, both tracks will be completely replaced and new points with a larger radius will be installed. Instead of the existing track structure with ballast and wooden sleepers, a solid concrete track will be installed.
Plaats Zumikon, switzerland
Omgeving tunnel
Projectomschrijving The Forchbahn tunnel between Waltikon and Neue Forch, built in the 1970s, was renovated. Damage to the building fabric as well as various modernisation works were necessary. The work was carried out during ongoing railway operations.
Start- en einddatum 2022/2024
Toepassing Roading
Uitvoerder Diamantbohr AG
Project Manager Forchbahn AG
Mapei coördinatie Reto Stutz

Gebruikte producten

ADESILEX PG2
ADESILEX PG2
Product not available for this market,
contact us
CARBOPLATE S
CARBOPLATE S
Product not available for this market,
contact us

In contact blijven

Abonneer je op onze nieuwsbrief om nieuws over Mapei te ontvangen