Rothorn Sörenberg

Location icon Sörenberg, switzerland
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref #: 4658
Categorie: INFRASTRUCTUREN

Projectgegevens

Project ceiling of the passage tunnel
Plaats Sörenberg, switzerland
Omgeving tunnel
Projectomschrijving At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Start- en einddatum 2023
Toepassing Underground constructions
Uitvoerder Gasser Felstechnik AG, Lungern
Project Manager Rothornbahn Sörenberg
Beeldmateriaal Ramon Lehmann Fotografie
Mapei coördinatie Urs Wirth

Gebruikte producten

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

In contact blijven

Abonneer je op onze nieuwsbrief om nieuws over Mapei te ontvangen