Project | Interior concrete surface preparation, leveling, installation of ceramic tile, wood flooring with sound-reduction and exterior large-format tiles |
---|---|
Plaats | Burlington, canada |
Omgeving | HOTEL |
Ingebouwd | 2021 |
Projectomschrijving | A variety of setting materials and innovative sound-reduction products from MAPEI were all part of completing a new-build complex of luxury residences and a four-star Marriott hotel on Lake Ontario’s north shore. |
Start- en einddatum | 2016/2021 |
Toepassing | Nieuw gebouw, Tile & stone installation systems |
Opdrachtgever | The Rosseau Group Inc. and Pearle Hospitality (The Pearle) |
Aannemer | New Horizon Development Group |
Uitvoerder | Classic Tile Contractors Limited (Bridgewater) and Eden Tile-It (The Pearle) |
MAPEI distributeur | Dragona Flooring et Prosol Inc. |
Beeldmateriaal | Carole & Roy Timm Photography and Greg van Riel Photography |
Mapei coördinatie | Gino D'Alesio |
Beschrijving | Architects: Gluckstein Design Planning (Bridgewater) and Studio Munge (The Pearle) |