Project | train repair hangar |
---|---|
Plaats | Basel, switzerland |
Omgeving | train |
Projectomschrijving | The SBB train repair hall was extended and the floor had to be recoated. The floor at platform level was coated with Mapecoat TNS Extreme, as a large part of the surface consisted of tamped asphalt slabs. The working pits were coated with Mapecoat I 24. |
Start- en einddatum | 2023 |
Toepassing | Voorbereiden van de ondergrond |
Uitvoerder | Anliker AG, Birsfelden |
Project Manager | SBB |
Mapei coördinatie | Roger Mohler |