New building of retirement and nursing home Tertianum

Location icon Olten, SUISSE
N° réf.: 4651
Catégorie: RESIDENTIEL

Réalisation

Chantier floors in rooms, the cooridors, and offices
Localisation Olten, SUISSE
Sous-catégorie VILLAGE DE RETRAITE
Demande All floors were laid with hard coverings. For the construction joints Primer MF EC Plus and Quarzo 0.9 were used. The anhydrite subfloors were primed with Eco Prim T Easy before being fully leveled with Ultraplan Eco.
Once the levelling compound had dried, the rooms were laid with LVT flooring and bonded with Ultrabond Eco V4SP Fiber. The corridors, offices and reception rooms were laid with Forbo Step PVC sheeting (extra slip-resistant flooring) and also bonded with Ultrabond Eco V4 SP Fiber.
Date de début et de fin 2023
Type de demande Sols
Entreprise de sous-traitance WSG AG, Basel
Installateurs Inevo AG, Pratteln
Architectes Fsp architekten, Spreitenbach
Responsable de projet Tertianum Management AG, Dübendorf
Coordination MAPEI Patrick Zengaffinen

Produit utilisé pour le projet

ECO PRIM T EASY
ECO PRIM T EASY
Consumption 100-150 g/m2
PRIMER MF EC PLUS
PRIMER MF EC PLUS
Résine époxy fluide pour consolider supports à base de ciment et réduire…
QUARZO 0,25 - 0,5 - 0,9 - 1,2 - 1,9
QUARZO 0,25 - 0,5 - 0,9 - 1,2 - 1,9
Sable de quartz lavé-séché au four, à utiliser avec les résines époxy et…
ULTRABOND ECO V4 SP FIBER
ULTRABOND ECO V4 SP FIBER
Ce produit n’est pas disponible sur le marché français,
Contactez-nous
ULTRAPLAN ECO
ULTRAPLAN ECO
Ce produit n’est pas disponible sur le marché français,
Contactez-nous

Restez en contact

Abonnez-vous à notre newsletter pour connaître les dernières nouvelles de Mapei