Chantier | Interior Foors Water proofing |
---|---|
Localisation | Dubai, ÉMIRATS ARABES UNIS |
Sous-catégorie | |
Construit en | 2015 |
Ouvert en | 2021 |
Demande |
Water proofing and Tiling
The project scope of work awarded to us was for the waterproofing of the substructure of the building, as well as the tiling work for the water features as well as the indoor and the outdoor facility. |
Date de début et de fin | 2015 |
Type de demande | Impermeabilisation |
Entreprise de sous-traitance | Brookfield Multiplex |
Installateurs | Deemah Stone/PFC |
Architectes | KEO International Consultants |
Copyright © 2024 MAPEI BENELUX S.A. Tous droits réservés.
Mapei Benelux S.A. Rue de l'Avenir, 40 4460 Grâce-Hollogne - Belgique
Tel +32-04-2397070 - mapei@mapei.be - TVA BE0455 328 589