TUNNEL UNDER DEAD VISTULA RIVER

Location icon Gdansk, Poland
Ref #: 20186
Category: INFRASTRUCTURES

Construction

Yard Tunnel
Location Gdansk, Poland
Subcategory TUNNEL
Opened in 2016
Application Profiling and finishing 30 000 m2 of concrete retaining walls and waterproofing.
Start and finish date 2011/2016
Application Type Products for underground construction (utt)
Contractor company LEWAR Sopot; MALTEA Warszawa; TECHNOBUD Nowy Sacz; MAKOWSKI Budownictwo Warszawa
Specialists involved EUROPROJEKT Gdansk
MAPEI Distributor DAGO TECH Gdansk
Credits Ireneusz Ropel, Dariusz Gorak, Michal Molenda
MAPEI Coordination Ireneusz Ropel, Michal Molenda

Product used for the project

EPORIP
EPORIP
TECHNICAL DATA: Pot life: 60 minutes Open time: 5 hours Setting time: 24…
MAPECOAT I 24
MAPECOAT I 24
Epoxy paint for acid-resistant non-toxic coating of concrete surfaces. Mapecoat…
PLANISEAL 88
PLANISEAL 88
TECHNICAL DATA Consistency: powder. Pot life of mix: approx. 1 h.…
DURESIL EB
DURESIL EB
Product not available for this market,
contact us
IDROSTOP B25
IDROSTOP B25
Product not available for this market,
contact us
MAPEGROUT 430
MAPEGROUT 430
Product not available for this market,
contact us
MAPELASTIC
MAPELASTIC
Product not available for this market,
contact us
MONOFINISH
MONOFINISH
Product not available for this market,
contact us
PLANITOP 400
PLANITOP 400
Product not available for this market,
contact us
PLASTIMUL 2K SUPER
PLASTIMUL 2K SUPER
Product not available for this market,
contact us
PLASTIMUL FIBER PLUS
PLASTIMUL FIBER PLUS
Product not available for this market,
contact us
TRIBLOCK FINISH
TRIBLOCK FINISH
Product not available for this market,
contact us
305 - MAPEFILL
MAPEFILL
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news