Dolder Grand Hotel

Location icon Zurigo, Switzerland
Ref #: 4483
Category: COMMERCIAL FACILITIES

Construction

Yard Boden-/Wandbeläge
Location Zurigo, Switzerland
Subcategory HOTEL/INN
Built in 2008
Opened in 2008
Application Exterior mosaics installation and interior parquet installation
Application Type Floor/wall coverings
Architects Foster Partners Ltd

Additional Attachments

Here you can download all documents related to this project

Product used for the project

NIVORAPID
NIVORAPID
Rapid setting, levelling and repair compound
PRIMER G
PRIMER G
Synthetic resin-based primer in water dispersion. Applications: Treating gypsum…
ULTRAPLAN ECO
ULTRAPLAN ECO
Ultra-fast hardening self-levelling smoothing compound with very low VOC…
ADESILEX P10
ADESILEX P10
Product not available for this market,
contact us
EPORIP TURBO
EPORIP TURBO
Product not available for this market,
contact us
ULTRABOND P902 2K
ULTRABOND P902 2K
Product not available for this market,
contact us
217 - ULTRABOND ECO 185
ULTRABOND ECO 185
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news