Circle Line Metro (Singapore)
Singapore
Ref #: 650029
Category: INFRASTRUCTURES
Construction
|
|
Yard |
Circle Line Stage 5
|
Location |
Singapore
|
Subcategory |
TUNNEL
|
Built in |
2006
|
Opened in |
2009
|
Application |
Reinstatement works such as bored tunnelling, excavation and completing basic station structure.
|
Application Type |
Products for underground construction (utt)
|
Contractor company |
Woh Hup (Singapore), Shanghai Tunnelling (China), Alpine Mayreder (Austria). WSA JV
|
Installer companies |
Woh Hup (Singapore), Shanghai Tunnelling (China), Alpine Mayreder (Austria). WSA JV
|
MAPEI Distributor |
Mapei Far East Pte Ltd
|
Exception occured while executing the controller. Check error logs for details.
Keep in touch
Subscribe to our newsletter to get Mapei news