Circle Line Metro (Singapore)

Location icon Singapore
Ref #: 650029
Category: INFRASTRUCTURES

Construction

Yard Circle Line Stage 5
Location Singapore
Subcategory TUNNEL
Built in 2006
Opened in 2009
Application Reinstatement works such as bored tunnelling, excavation and completing basic station structure.
Application Type Products for underground construction (utt)
Contractor company Woh Hup (Singapore), Shanghai Tunnelling (China), Alpine Mayreder (Austria). WSA JV
Installer companies Woh Hup (Singapore), Shanghai Tunnelling (China), Alpine Mayreder (Austria). WSA JV
MAPEI Distributor Mapei Far East Pte Ltd
Exception occured while executing the controller. Check error logs for details.

Keep in touch

Subscribe to our newsletter to get Mapei news