System for the Installation of Tiles over a Timber / Wood-Based Substrate - C15

New building
Internal flooring
Installation of ceramic tiles

This work method statement covers the system for the installation of tiles over a timbre / wood-based substrate

Application steps

1
Properly prepared timber / particle board substrate     
2
Primer
3
Levelling Compound
4
5
6
Silicone

Application procedure

Consult all technical phases related to this solution

You may be interested in Installation of ceramic tiles
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news