System for the Installation of LVT over Concrete with High Residual Moisture Content - R05

New building
Internal flooring
Installation of textile flooring; Installation of resilient flooring; Installation of LVT

This work method statement covers the system to install LVT over concrete with high residual moisture in internal environments.

Application steps

1
Properly prepared concrete substrate
2
Moisture vapour barrier
3
Levelling compound
5
LVT floor covering

Application procedure

Consult all technical phases related to this solution

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news