System for the Installation of Carpet Tiles on Uneven Concrete with High Residual Moisture Content - R12

New building
Internal flooring
Installation of textile flooring; Installation of resilient flooring; Installation of LVT

This work method statement covers the system to install carpet tiles over an uneven concrete substrate with high residual moisture

Products

1
Existing uneven concrete
2
Moisture vapour barrier
3
Levelling compound (if required)
5
Adhesive to be chosen from the following options
6
Vinyl or vinyl-backed carpet tiles

Application procedure

Consult all technical phases related to this solution

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news