System for the Fast Track Installation of Sheet Vinyl, LVT and Rubber Flooring on Concrete with High Moisture - R18

Commercial building
Internal flooring; Gymnasium
Installation of resilient flooring; Installation of LVT

This work method statement covers the fast track system to install sheet vinyl, LVT and rubber floor coverings over concrete with high residual moisture in internal environments

Application steps

1
Properly prepared concrete substrate
2
Moisture Vapour Barrier
3
Levelling compound
6
Resilient Floor Covering

Application procedure

Consult all technical phases related to this solution

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news