System for the Installation of Engineered Timber Flooring Over Difficult Substrates - H03
This work method statement covers the system to install tiles over difficult substrates.
System for the Repair and Protection of Steel Reinforced Concrete - H08
This work method statement covers the system for repair and protection of steel reinforced concrete.
System for the Installation of Ceramic, Porcelain or Stone Tiles on Existing Tiles - H04
This work method statement covers the system to install tiles over existing tiles in areas where…
System for the Fast Track Installation of Tiles in Internal Wet Areas - H07
This work method statement covers the fast track systems for waterproofing and tiling bathrooms.
System for the Installation of Tiles over a Timber/Wood-Based Substrate - H06
This work method statement covers the system to install tiles over a wood-based substrate in areas where…
System for the Installation of Engineered Timber Flooring Over a Concrete Substrate - H01
This work method statement covers the system to install tiles over uneven concrete.
System for the Installation of Tiles in Internal Wet Areas - H05
This work method statement covers the system to install ceramic/stone tiles in internal wet areas.
System for the Installation of Timber Flooring over a Moisture Vapour Barrier - H02
This work method statement covers the system to install tiles over uneven concrete.
To access the latest hardware catalogue, click on the download button below