Art der Baustelle | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Standort | Hérémence, Schweiz |
Unterkategorie | HOTEL |
Anwendung | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Anfangs- und Abschlussdatum | 2022 |
Art der Anwendung | FLOOR/WALL COVERING |
Architekten | Mijong Architecture Design |
Projektmanager | Grande Dixence SA |
Koordinierung von MAPEI | Marcello Maieron |