Art der Baustelle | train repair hangar |
---|---|
Standort | Basel, Schweiz |
Unterkategorie | TRAIN |
Anwendung | The SBB train repair hall was extended and the floor had to be recoated. The floor at platform level was coated with Mapecoat TNS Extreme, as a large part of the surface consisted of tamped asphalt slabs. The working pits were coated with Mapecoat I 24. |
Anfangs- und Abschlussdatum | 2023 |
Art der Anwendung | SURFACE PREPARATION |
Installationsunternehmen | Anliker AG, Birsfelden |
Projektmanager | SBB |
Koordinierung von MAPEI | Roger Mohler |